Model Rail(road) Plan
Just a plan or a dream
Multi-functional table with model railroad - table top in an other way
Endless story - caught in eternal planning, not reality!
Ersatz - temporary solution: high traveling functional table with NOCH briefcase ready-made scenery Sonnenalpe (Engl.: sun alp) in N scale. One house and one tree had to be made pluggable, because less than one finger thick installation depth was missing.
Eckanlage mit Paradestrecke (Engl.: corner layout with
display line), in: Joachim M. Hill,
Modellbahn-Anlageplanung, 3rd edition, Düsseldorf,
Alba-Verlag, 1991 (Alba Modellbahnpraxis Band 2, ISBN
3-87094-553-3) is the inspiration for the big layout.
Adapted for N scale (1:160) the squares with stroke-dotted line
have a length of 330 mm (approx. 13 inches).
Course
The eternal model railroad dream. Never realized but improved all
the time
Electrified (cat wire) double-tracked main line leaves
the underground in south-east, runs in the foreground along the
locomotive depot and disappears to the underground in the
north-west again. The single-tracked line branches of behind the
depot about in the middle of the scenery and runs through a loop
in the south-west to the station in the upper level. There it
splits. The line in the background, designed for push-pull trains,
ends in a mall park station (see insert) in the far south-east. The
line in the foreground runs over the depot area on a great bridge
into a loop to the underground, passes under the station and
appears west of it again. There is a branch, either to the incline
heading for the main line or to the ramp for the station
approach.
The »rail egg« in the depot area is just an option.
Probably there will be left just one single siding to reach the
branch.
The line in the underground is not clear yet. But much speaks for
designing a »dog bone« (squeezed oval) arrangement with a
park station for trains with about 1 700 mm. So for
instance trains built with nine 26.4 m Eurofima wagons with an
overall length of 165 mm. Whether this station is equipped
with points or a big sliding board/service table is not cleared
yet.
Δ
Technique and material
Electronic control then anytime will be done by
analogue self-block operation with constant current and additional
driving transformer, if necessary. PC control rather improbable. -
Otherwise I could truly watch the trains at the Nuremberg main
station...
For the moment analogue, because the present vehicle pool - from
period I (e.g. Adler) to IV (e.g. Airport-Express) - is well-hung.
Suppliers were especially Arnold N, Fleischmann piccolo, Minitrix
and Roco. But the digitization will surely strike.